Production lineinstallation process(for reference)
One,to eachM12*80mm adjustablefoot cupwithaM12 nut,is used to adjust theheight ofthe rear fastening.
Two,install adjustablefoot cup:machine,end frame,dynamicframemounted on theM12*80mm adjustablefoot cup,horsebut installφ Torres 25 roll
Three,positioning:
1,determine the location,directionof the production line,the general situation isfrom theend frameto thepowerhead.
2,set thepowerhead,powerheadon thefinalpiece,thenputforwardbyhorse,horse2 meters spacing(L25mlinepower frametheendpoint and theadjacentmachinespacing of 3 meters),theformeris atail rack.
3,put theedgeguide:inmachine.Both sidesareplaced on theedgerail,head,tailon both sides of theedgerailmedial openingthelong groove,for the installation ofφ 90 head, tail roller.(L25m line power head arranged on both sides of edge 3 meters long rail
4,with M8*100long screwa flat matinsertedgerailendholeand pinsconnecting hole,anda flat
Pad,spring washer,nut,do not tighten.Note:edgerailsspaced 1 malittleholein thetop ofindigenousandroller.
5,in orderto loosen the screws,install the lampholder,thenslightly tighten thenut.
6the production line isleveling,straightening,screwfasteners.
7,installedslot,socket:
8,undo thehead powerroller bearing seatand φ 57 tensioning roller,a PVC belt, replace the power roller and tensioning roller. At the same time, φ90 head, tail roller is arranged on the head, tail medial edge guide slot, and M14*300mm installedon the tension adjusting screw. The belt of φ25 small rollers arranged in the guide rail inside the hole, 1 metresper ro
9,the beltof galvanizedplatefixed on thetwoguide rails between thesix outer cornersof M4*19self drillingscrews,each of the twoφ 25 small roller is installed betweena, note: the surface plate than φ25 small rollers above the low 0.5mm. The PVC belt tensione
10,the installation of lightssupporting rod and alamp:1,will be fixedon the lamp framebeam ofthe outer end ofthe sixM4*38screwsself-drillingangleunderthe lamp holderrod.2,withthe first half ParkcrossM4*19self drilling screwlampbracket is fixed on thelamp holderrod,(Note:to calculate thedistancebetweenlampbracket,3),with 1.5squarewiregroundingwires.
11,installation of equipmenttable:1,with M8*45sixscrewsthrough the self-madecardcodethe instrumentbedplatesupportingrod is fixedon the lamp frame(height,custom);note:bigholein the following.2,the instrumenttablecoveredwithwood screws,M4*15through the instrumentbedplatebelowbig holeup andbedplateis fixedly connected.
12,installation instructionframework:first determine theframebelowtheheight ofaluminum,(custom),halfround headcrossM4*38self drilling screwswill be followingaluminumfixedon the lamp frame,and thentake a A4hardrubber sleeveonDetermination ofaluminum,aboveposition,note: toensure A4hardrubber sleevebetween the upperaluminumcan smoothlyslide,downbut notout.
13,install the fan:1,install the fanboom:M8*70sixscrewsthrough the self-madecardcodewillfanconnect the boomon the lamp framebeam.2,withcountersunk headscrewsM5*20fan and theself-madeplatefixation.3,with M8*25sixscrewsthrough the self-madecardcodewillfanplateand self-madecode cardconnection.
14,the fixed electricalbox: theelectric control boxis arranged on the powerheadend instrumentbedplate.
15 to install a separatetable:1,to eachM10*80mm adjustablefoot cupwithaM10 nut,is used to adjust theheight ofthe rear fastening,2,install adjustablefoot cup:will work independentlysingleframefootmountM10*80mm adjustablefoot cup,3,the2 singleframe,connecting rod(2root),a lower connecting rod(1)withsixscrewsM8*50asan independentworkbench.4,install the independentworking table:usewood screwM4*20
Sixteen,connection,debugging:power lineaccesscontrol box,slowlytighteningPVC belt,PVCbeltrunningin the middle,contact frictionand noton both sides ofedge guardrai