原发布者:碰撞的艺术
工程预算表工程名称:颖水华庭3#楼(08定额取费)其中序号12345678910编号1-11-5R*21-381-B41-461-58平整场地人工挖土方一般土深度(m)4以内配合机械挖土:人工乘以系数2机械挖土一般土回填土夯填装载机装土自卸汽车运土1km内基坑内换3:7灰土名称单位100m2100m31000m3100m31000m3100m3m3m310m310m3工程量11.2425.2874.75810.393.0559.0231.156343.058197.783单价464.13合价5217.61人工合价材料合价机械合价3915.48管理费合利润合价价664.72998.2910701.79512.62106.4119450.32276.974703.65338.531378.79456.082995.83496.22637.4805.06326.871322.17440.352872.71354.497214.92257.08第1页总17页综合工日含量8.130.468.1818.1817.1645.51.261.2612.019.68合计91.06161.0138.91188.8852.42410.3939.37801.3836.731914.542960.3315650.3813847.032533.5512054.631091.0511335.466922.8721149.37687.448121.89696.238365.1175449.1117646.6549656.95534.416646.56412.032516.7929208172.22-63中心压管式CFG桩桩长(m)15以上人工乘以R*2,J*2系数2,机械乘以系数22-633-13-58中心压管式CFG桩桩长(m)15以上砖基础(M5水泥砌筑砂浆)加气混凝土块墙(M5混合砌筑砂浆)满堂基础混凝土无梁式(C20-40(32.5水泥)现浇碎石砼)换为【现浇碎石混凝土